Before #5… Second Bedroom, phase 2

I’ve posted before and after pictures for the second bedroom previously, but I’m considering the boxing-in of the water tank and building of a cabin bed as a second phase of development in its own right.

From Barn Conversion 2011
From Barn Conversion 2011

I’m afraid that it’s pretty messy in there as it’s still being used as a dumping ground. The cabin bed will run along the length of wall shown in the second photograph with wardrobe doors on the left to allow access to the tank then the entrance to the bed to the right of that, about where the chequered throw covered box is now. As you can see, the header tank that sits above the door and the poor positioning of the roof-light in relation to the main tank are going to make boxing in tidily very challenging…