Flue guard completed

As I’ve previously mentioned, with the flue from the multi-fuel stove running through the second bedroom without being boxed in or otherwise closed off there was a need to provide a guard in order to conform with building regulations Document J section 1.45. The flue requires a long, tall, open-topped guard and with no suitable shop bought options and my internet searches yielding no made to measure options, do-it-yourself was the only option.


From Barn Conversion 2012

The guard is constructed from perforated steel sheets and aluminium bars, that have been cut to size with a combination of a hack saw and a disk cutter then stuck together with a resin ‘welding’ paste. It all sits on a wooden plinth.


From Barn Conversion 2012

One important addition was the sloping top that stops you from using the angles at the top of the guard as shelving or to hang discarded clothing from thereby introducing a fire risk (as was the tendency before the sloping top was added).

After hours of cutting, sticking, clamping and waiting – Done!


Posted

in

by

Tags:

Comments

One response to “Flue guard completed”

Leave a Reply

Your email address will not be published. Required fields are marked *