Building Progress ~ April 2009

Determined to beat my previous poor showings, here’s the April update, just a few days after April has ended … impressed?

This post should really be titled Stairs Progress ~ April 2009 (but that’s already been done) as there’s not a great deal more than the installation of the stairs to report.

In addition, I’ve progressed with painting the bathrooms, having finished downstairs (except for the utility room) and the landing. I’m using an off-white just to give myself a break from the white…(big deal!)

I’ve also put the standalone sink unit together (complete with sink) ready for the plumbing.

May holds the prospect of completing the painting (or at least the first coat – can’t even think about having to apply the second coat throughout the whole place such is my love of painting) and tiling the showers. Then I’ll be back to lime pointing…


Posted

in

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *