Building Progress ~ December 2011

Due in-part to the warm, but wet weather and in-part by the desire to complete the work by the Christmas deadline I set myself, December has been dominated by work to box-in the thermal store and build a cabin bed in the second bedroom.

These subjects have already been pretty well covered elsewhere – I’ve drawn up plans and posted about the initial construction of the cabin bed. I’ll be writing in detail about finishing the cabin bed soon – there are just a few finishing touches to complete. I also hope to put together a set of generic Sketchup plans for building something similar. All-in-all it’s been a really enjoyable process, I’ve found working with timber to build a large, solid fixture to be really satisfying. As I could have predicted ahead of time, the least enjoyable aspect of the build (as anyone who follows me on Twitter where I’ve moaned plenty will already know) has been getting the two sets of wardrobe doors to hang straight and true (and they still don’t – that’s one of the main outstanding tasks).

But doors aside, I (& most importantly my son) are pretty happy with the results – the pirate ship / cabin bed is almost ready to sail. I’ll leave you with an image of the almost completed build…

From Barn Conversion 2011

Beside that I put up some kitchen blinds and salvaged a piece of wood that I’ll use as the basis for a high-level shelf in the kitchen. Pretty poor show really, but Christmas tends to slow down progress…

Happy New Year!


Posted

in

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *