Building Progress ~ November 2010

At last I’ve broken the strangle-hold that pointing has had on me! I’ve also gone back to being late making my monthly updates to the website (this one for November being written on the 15th of December) – swings & roundabouts I guess…

I’ve retired from pointing for 2010, probably in truth falling just a little bit short of the finishing line in relation to my original goals for the year. I have about a square metre to point at the top of the back wall and the gable end (6 or 8 square metres) to finish. We had a major (for Carmarthenshire) deluge of snow on the day that I intended to finish the back wall and the cold weather has put me off ever since.

Beyond pointing I’ve been busy in the bathroom, finishing the floor, mosaic tiling and boxing-in. As previously reported, we started some work on landscaping the garden, first with a digger and I then started to level the patio area by hand with a pick & shovel and plan to lay flag stones on sand in the area shortly. I’ve also started to build a small ‘hut’ around the external tap that stands rather proudly at the front of the barn. My ‘tap hut’ is another victim of the weather as it’s been too cold to play work with my new concrete mixer to mix up the mortar and aggregate mix I need to finish the ‘hut’.

I’ve also got a satellite dish to install, but that’s a job for December and all those Christmas repeats on TV…


Posted

in

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *