Building Progress ~ November 2011

We completed the fencing around the shed in November – the gate latches and catches are all in place. It will certainly be an improvement when the field next gets residents. After much trial and error and eventually giving up only to find it was fixed, I got the satellite dish back into action.

The tile-topped boxing-in in the bathroom (wooden frames, with painted sides and a slate and mosaic tiled top) has stalled. I’ve built all the constituent parts and I now just need to get the impetus up to assemble and finish. The reason for my distraction has been my deviation to the world of wood…

I’ve already written quite alot about my fledgling forays into carpentry. Suffice to say that my first project was to build some shelving to fit in the under-the-stairs area and that came out pretty well even if I do say so myself – under the stairs shelves. The second project, started in the last couple of weeks of the month has been to box in the thermal store and build a cabin bed in the second bedroom. I’ve drawn up plans and made pretty good progress having made a start on the base of the bed and the two large frames that will form the ends of the cabin bed. More on this soon…


Posted

in

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *