The flue guard that I’ve been building from perforated steel sheets, aluminium joints and resin based adhesive is finished and does the job of keeping stray clothing and children away from the potentially hot flue.

I had a visit from the building control officer at the start of the month. Went really well with just a couple of pieces of paperwork to chase up and get completed before the barn is signed off.

I’ve added extra security in the form of locking door bolts to the top and bottom of the exterior doors and locks on the roof windows. I must admit I think that the roof window locks are probably overkill, but the whole place is now very lockable.

I did some further work on the cabin bed in the second bedroom. I removed an annoying squeak that had developed between two touching but unjointed pieces of wood by inserting a small sheet of metal. I also reworked the walls around the bed to tidy things up and did some further work on tidying the boxing in. I’m thinking of using the whitening oil that I used of the stairs and banisters to give a toned down finish to the bare wood that I’ve used for the boxing in.

At the end of the month I was away in Brittany for the week, which helped contribute to my lack of progress, but did provide a great week away from things and an excellent time with my family.